Protect Lakeville Preserving Our Land, Water, Wildlife & Community

About

Corrections

How to flag something that looks wrong, and a dated record of factual corrections this site has made since launch.

60-Second Summary

  • This site corrects factual errors as soon as they're identified and logs the correction here — nothing is quietly edited without a record.
  • 4 corrections are logged below, most recently from the site's September 4, 2026 factual audit.
  • If something on this site looks wrong, out of date, or missing its source, it should be flagged — see "How to submit a correction" below.
Confirmed Fact
Confirmed Fact

How to submit a correction

Identify the specific page, the specific statement, and — if possible — the primary source that shows a different figure or fact. This site prioritizes primary government, agency, and peer-reviewed sources over secondary reporting when evaluating a correction.

Email info@protectlakeville.org with the page, the statement, and the source — see the Contact page for this and other ways to reach this site.

Corrections Log

Earth-removal fee corrected from $0.15 to $0.25 per cubic yard for all revenue calculations

Two independent, dated Town documents (the FY2027 budget and a January 6, 2026 Select Board Agenda Item Report) confirm the rate was adjusted to $0.25/cubic yard, plus a $200/acre administrative fee. The Town's separate, still-live Earth Removal Permit Information page had not been updated and continued to show $0.15/cubic yard. Fee revenue calculations sitewide now use $0.25/cubic yard; the conflicting $0.15 figure is still shown and cited, not removed, alongside its own calculated revenue total.

Lakeville Chapter 140 (Earth Work Bylaw) page rewritten from verified bylaw text

The page previously described nine paraphrased standards inferred from general knowledge of earth-removal bylaws, not Lakeville's actual ordinance text. It has been rewritten using the verified bylaw (via eCode360), with the exact permit-denial standard quoted and ten conditions in near-verbatim language.

Truck-trips chart corrected to match its own accessible data table

A chart showed a "Total movements" bar at 645,000, which contradicted the page's own accessible data table showing 430,000 for the same figure. Bars were relabeled unambiguously and the contradicting value corrected.

Dead and unspecific source links corrected

An MBTA schedule link pointed at a 404'd route ID and was corrected to the live route. A news-article citation pointed at a publication's homepage rather than the specific article and was corrected to the direct article URL.