Protect Lakeville Preserving Our Land, Water, Wildlife & Community

About

Methodology

Every statement on this site carries one of five labels. Here is exactly what each one means, and what it deliberately does not claim.

60-Second Summary

  • Five classifications appear throughout the site: Confirmed Fact, Calculated Scenario, Potential Impact, Resident Observation, and Requires Determination.
  • A classification describes how well-supported a statement is — not how important or how alarming it is.
  • "Requires Determination" means the public record does not yet answer the question either way. It is not a claim that something is being hidden.
  • Calculated Scenarios show their formula, inputs, and assumptions, so a reader can check or challenge the math.
Confirmed Fact
Confirmed Fact

Confirmed Fact

Directly supported by an authoritative document.

Calculated Scenario

Calculated Scenario

A mathematical result of clearly stated assumptions.

Potential Impact

Potential Impact

A recognized possible effect, supported by engineering, health, environmental, or economic research — not a site-specific measurement.

Resident Observation

Resident Observation

Firsthand local experience, not independently measured.

Requires Determination

Requires Determination

A project, engineering, or regulatory detail that remains unresolved in the public record.

How this differs from a factual audit

Classification and sourcing are ongoing editorial practice, not a one-time event. The site has also undergone a dedicated factual audit — every numeric and regulatory claim independently re-checked against primary sources — logged on the Corrections page.