- At 30 cubic yards per load, the full 6.45M cubic yards is approximately 215,000 loaded truck trips — about 430,000 total movements counting empty returns.
- At 20 cubic yards per load (a smaller, more common local truck size), that figure rises to approximately 323,000 loaded trips.
- The owners told the Town they hoped rail could carry some volume depending on the eventual end user — use the calculator to see how the truck-trip count changes if less than 100% moves by road.
- The maximum daily truck-trip count the applicant would commit to has not been disclosed.
Take Action
Help Protect Lakeville
Add your name to the petition asking the Lakeville Select Board to deny and not approve the earth-work permit for the proposed 30 Howland Road earth-removal operation as presently proposed.
Illustrative scenario — not an applicant operating commitment
Fixed input: total project volume of 6,453,850 cubic yards (source: Lakeville public hearing notice). Rail can reduce road hauling only to the extent it is operationally available, physically connected, commercially viable, and contractually committed — see Rail Feasibility.
Illustrative Truck-Trip Scenarios
Calculated ScenarioTruck trips (loaded and total, including empty return)
| Loaded trips at 30 yd³ | ≈215,000 |
| Loaded trips at 20 yd³ | ≈323,000 |
| Total movements (30 yd³, incl. empty return) | ≈430,000 |
Assumptions: 30 cubic yards and 20 cubic yards represent a typical range of dump-truck/tri-axle capacities. Total movements = loaded trips × 2 (one empty return per loaded trip).
Methodology: 6.45M cubic yards ÷ truck capacity, rounded up to the nearest whole trip.
Key sources
- Lakeville traffic study — Howland Road corridor — Town of Lakeville, 2024
- Aggregate, sand and gravel railcar equipment — typical 100–110 ton capacities — CSX Transportation
What has not been disclosed
- The maximum number of truck trips per day, week, and year the applicant would commit to
- The absolute maximum truck-trip scenario if rail transportation does not materialize at all
- Proposed haul routes, hours of operation, and any routing restrictions
- Howland Road's existing pavement structural capacity for repeated heavy-axle loading
See also: Roads & Infrastructure for the Town’s 2024 paving estimate, and Rail Feasibility for what would actually be required to move volume by rail instead of road.
Key sources
- Lakeville public hearing notice — proposed removal of approx. 6,453,850 cubic yards — Town of Lakeville, 2026
- Lakeville traffic study — Howland Road corridor — Town of Lakeville, 2024
- Aggregate, sand and gravel railcar equipment — typical 100–110 ton capacities — CSX Transportation
- Soil design guidance — loose dry sand, approx. 99–102 lb/ft³ — MassDOT